Everything about Termite Control Machine

9 Simple Techniques For Termite Control Liquid Or BaitExcitement About Termite Control Liquid Or Bait

Some Known Incorrect Statements About Termite Control Maintenance


Having a termite baiting program, there can be no absolute guarantee of long-term protection of nearby buildings. There can be other termite nests nearby the building that do not find the bait stations. Your home is a considerably larger bait station. Other termite nests may exist in trees, under concrete on-ground flooring and in-fill patios of neighboring properties. .

The Sentricon baits are placed in their in-ground bait stations after removal of the infested lumber therein. This will involve sufficient disruption of the termites such that they prevent the in-ground Sentricon bait station, entirely.

This serious short-coming is overcome by the patented Exterra Termite Stations where the timber is aligned around the cylinder like the bait can be inserted without such disturbance of the termites present.

RECOMMENDATION: Exterra or Sentricon be used where a complete chemical soil barrier treatment using Termidor or Premise is not practicable or desired, and in which a several thousand termites are likely to consume the bait.

Excitement About Termite Control Machine


A termite monitoring and baiting software can be integrated with a range of methods including (1) drilling vulnerable trees and eradication of any termite nest located therein, and (2) in conjunction with a follow up chemical soil treatment using Termidor or Premise.

Rapid termite colony development and building infestation is generally associated with a readily available timber food and moisture supply nearby the central nest. In addition, buildings are often constructed in a manner that allow termites to gain undetectable entry from the ground to the structural timbers of the building. Listed below are some useful recommendations for the home owner to carry out in order to decrease the risk of termite activity inside a building. .

Moisture exclusion from inside the wall cavities, around the base of the building and sub-floor region (if any). Water run-off can be excluded from a sub-floor region by the installation of ag-drains. Make sure there's adequate cross flow ventilation in the sub-floor area. In addition, a skilled plumber should be engaged to ensure there's no water leakage from plumbing pipes in the bathroom, the shower recess, kitchen, down pipes, guttering and air conditioning unit overflow.

The smart Trick of Termite Control Machine That Nobody is Discussing


Please note: high humidity, dampness or moisture accumulating in a wall cavity is obviously high risk to encouraging large scale termite activity inside the building. .

Removal of any timber in contact with the ground. Timbers should be kept above ground to allow full inspection of subterranean termite activity (coming out of the ground thereunder). Any landscaping using timber chip mulch and railway sleepers should definitely be eliminated, as they provide prepared food supply to help in rapid termite colony development. .

Ensure inspection access is unimpeded, particularly in sub-floor regions (suspended flooring ) in order to search for evidence of termite activity. If your property is on a concrete slab on ground flooring, make sure you can inspect the entire external slab border for evidence of termite mud-shelter tubes. Do NOT allow this region to be coated by openings, landscaping, planter pots, etc, as termites often gain entry into the walls of a building via this area, especially through external weep holes and minute (2 mm) openings in the mortar in brick-work. .

The Best Strategy To Use For Termite Control Maintenance


If you find live termites or termite damaged timbers DO NOT disturb the region. DO NOT use spray can or insecticides on the termites. If sufficiently disturbed, the termites are likely to move elsewhere, and might not special info be rediscovered until additional evident damage has been done. The termite controller can introduce Intrigue termite dust or Exterra termite bait right to the live termites present in an attempt to eliminate the entire termite colony - as discussed in detail above. .

Consumer Note: the installation of a chemical soil barrier does not negate the need for regular competent inspections - at least 3 to 6 months where the termite risk is high.

More About Termite Control MachineThe Only Guide to Termite Control Maintenance
We recommend 3 or 6 monthly inspections have been performed for the initial two years after a chemical soil treatment. Monitoring of "stand-alone" baiting systems

BE AWARE the correct identification of harmful termite species, inspection of a building for tell-tale signs, analysis of circumstances and implementation of an effective termkite control program requires professional ability and judgement depending upon professional training and extensive field-work experience in termite control in a wide variety of circumstances.

The Definitive Guide for Termite Control Maintenance


Termites, also known as white ants, are small soft bodied insects around half of the size of a match-head. It's estimated that they cause more damage to houses in Australia than from flood, fire and storms combined. The harm is so great that termite damage is not covered by insurance meaning its a problem that you need to keep on top of with Termite Pest Control.

Leave a Reply

Your email address will not be published. Required fields are marked *